:quality(75))
|Allgemeines
New reference project - district heating with PV
Since the end of February 2019, a dozen 3-kilowatt immersion heaters and modern AC•THOR power controllers have supported the district heating supply of a new residential complex in Vienna. An energy management system ensures that the entire solar power of the 47-kilowatt system on the building is used linearly controlled for hot water preparation via an 800-litre heat storage tank.This is the first time that decentralised hot water generation based purely on solar power has supported a district heating network of this size. "The project implemented together with the company KELAG Energie und Wärme GmBH will set a precedent. It means a great success for the whole sector coupling, since the sinking price for solar modules meanwhile makes further Power-to-Heat applications economical", explains my-PV managing director Dr. Gerhard Rimpler.More details about the
project
.Weitere Artikel
:quality(75))
Partner
Neuer Kompatibilitätspartner Deyemy-PV Produkte sind nun auch kompatibel mit den Wechselrichtern von Deye, die sich rasant am europäischen Markt verbreiten.
Mehr lesen...:quality(75))
Allgemeines
Praxiswissen durch Fachveranstaltung bei Heger EnergietechnikWie gelingt ein solarelektrisches Firmengebäude? Experten beleuchteten dies bei einem Event von Heger, ETHERMA und my-PV.
Mehr lesen...:quality(75))
Partner
my-PV wird kompatibel mit Janitzamy-PV integriert nun Janitza-Zähler – bewährte Geräte aus dem Bereich der professionellen Energiezählertechnik.
Mehr lesen...