)
Drone video - progress of the company building
News about our company's construction progress: a new drone video shows that the first PV modules and the windows have already been integrated into the new building
In the short video clip you can see how quickly the lightweight timber construction has given the building the necessary height. As a result, the interior work and the roof and facade work could also be started quickly. In the meantime, the photovoltaic modules have been mounted on the roof and the windows have been installed in the building.
In the next weeks we will start with the exterior design, the construction of the parking lot (of course without sealing the ground) and the facade will be further covered with photovoltaic modules and wooden parts.
A short inventory can be seen here:
)
For data protection reasons, the loading of third-party providers requires your consent. More information can be found in our privacy policy.
More articles
)
General
Use dynamic electricity tariffs for heat with the my-PV DTO and HEA•THORUsing low-cost electricity prices from the exchange market for heating is no longer a vision of the future!
Read more...)
General
my-PV at ISH 2025: Experience the future of photovoltaic heat!From March 17 to 21, the world’s leading trade fair for water, heating, and air conditioning will take place in Frankfurt.
Read more...)
References
Climate protection award for a heritage multi-family house: Photovoltaic heat in a historic buildingA 150-year-old house has been designed to be as energy-independent as possible – earning it a Climate Protection Award.
Read more...