ETHERMA und myPV News
|Support

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Good to know

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

References

New feed-in regulations in the Netherlands require a rethink

A Dutch homeowner minimizes feed-in fees by utilizing surplus PV energy to heat water.

Read more...

Company

SOL•THOR wins German Design Award 2025

The DC Power Manager SOL •THOR has received the German Design Award in the category “Excellent Product Design”.

Read more...

General

Minimizing feed-in costs in the Netherlands

The Netherlands introduced a fee for feeding electricity into the grid. Fees can be reduced by increasing self-consumption.

Read more...