Velog News
|General

Uninterrupted PV boom in Spain

In Spain, photovoltaic projects with a total capacity of 60 GW received grid access at the end of August and are now awaiting regional feed-in approval. This is the result of data from the central Spanish transmission grid operator Red Electrica de España.

The sum of the new systems is ten times the current PV level in the country

. Currently, 5.3 GW are in operation. Most of the approved solar systems are in a waiting position in Andalusia (13.9 GW), Castile-Leon (7.9 GW), Castile-La Mancha (7.1 GW) and Extremadura (6.8 GW). Further projects with a total of 50 GW were still in the approval process of the electricity grid operator at the end of August. There was a rejection for systems with a total of 32 GW.

Wind power is also enjoying unbroken popularity in Spain: at the end of August, projects with a capacity of 23.6 GW had a grid access permit but had not yet been installed. They double the level of all wind turbines installed in Spain.

More articles

References

School project brings solar heat to a townhouse

Hot water from an off-grid photovoltaic solution instead of an oil-fired heating system – a cost-effective alternative.

Read more...

Partner

New Compatibility Partner: FENECON

The solar-electric solutions from my-PV are now also compatible with products from FENECON.

Read more...
Aerial view of a renovated family home with rooftop PV system, landscaped garden, and swimming pool.

References

Heat generation from PV surplus in the Lavant Valley

Nestled in the picturesque Lavant Valley, a renovated multi-family home demonstrates the full potential of solar power.

Read more...