)
Drone video - progress of the company building
News about our company's construction progress: a new drone video shows that the first PV modules and the windows have already been integrated into the new building
In the short video clip you can see how quickly the lightweight timber construction has given the building the necessary height. As a result, the interior work and the roof and facade work could also be started quickly. In the meantime, the photovoltaic modules have been mounted on the roof and the windows have been installed in the building.
In the next weeks we will start with the exterior design, the construction of the parking lot (of course without sealing the ground) and the facade will be further covered with photovoltaic modules and wooden parts.
A short inventory can be seen here:
)
Por motivos de protección de datos, las integraciones por parte de proveedores externos requiere su consentimiento. Puede encontrar más información al respecto en nuestra política de privacidad.
More articles
)
General
Utilice tarifas eléctricas dinámicas para calefacción con el my-PV DTO y HEA•THOR¡Utilizar electricidad barata del mercado para calefacción ya es una realidad, no solo la electricidad renovable de un sistem
Leer más...)
General
¡my-PV en ISH 2025: ¡Experimenta el futuro del calor fotovoltaico!Del 17 al 21 de marzo, se celebrará en Frankfurt la feria líder mundial de agua, calefacción y aire acondicionado.
Leer más...)
Referencia
Premio de protección del clima para una casa multifamiliar patrimonial: Energía solar fotovoltaica en un edificio históricoUna casa de 150 años, diseñada para ser casi autosuficiente en energía, ganó un Premio de Protección del Clima.
Leer más...