AC•THOR 9s – Operation with 3 single-phase heating elements
Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.
The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.
CAUTION:
This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!
The following instructions from the operating manual are important:
Solution
The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).
Interesante
Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!
More articles
General
Tres módulos fotovoltaicos cubren el 50% de las necesidades de agua caliente.
Con solo unos pocos módulos, puedes generar cantidades significativas de agua caliente, utilizando SOL•THOR.
Leer más...Empresa
Merry Christmas and a happy New Year 2025
During Christmas, we are taking a short break. Our technical support will be available during the holidays.
Leer más...Referencia
Nuevas regulaciones de alimentación en los Países Bajos requieren una reconsideración
Un propietario holandés minimiza las tarifas de alimentación utilizando el excedente de energía fotovoltaica.
Leer más...