Drone video - progress of the company building
News about our company's construction progress: a new drone video shows that the first PV modules and the windows have already been integrated into the new building
In the short video clip you can see how quickly the lightweight timber construction has given the building the necessary height. As a result, the interior work and the roof and facade work could also be started quickly. In the meantime, the photovoltaic modules have been mounted on the roof and the windows have been installed in the building.
In the next weeks we will start with the exterior design, the construction of the parking lot (of course without sealing the ground) and the facade will be further covered with photovoltaic modules and wooden parts.
A short inventory can be seen here:
Pour des raisons de protection des données, le chargement des fournisseurs tiers nécessite votre consentement. Plus d'informations peuvent être trouvées dans notre politique de confidentialité.
More articles
Généralités
Trois modules photovoltaïques couvrent 50% des besoins en eau chaude.
Avec seulement quelques modules, vous pouvez produire des quantités importantes d'eau chaude – en utilisant SOL•THOR.
lire la suite...L'entreprise
Merry Christmas and a happy New Year 2025
During Christmas, we are taking a short break. Our technical support will be available during the holidays.
lire la suite...Références
Les nouvelles réglementations sur l'injection d'électricité aux Pays-Bas nécessitent une réflexion.
Un propriétaire néerlandais minimise les frais d'injection en utilisant l'énergie excédentaire de ses panneaux solaires.
lire la suite...