ETHERMA und myPV News
|Generale

Support AC•THOR / AC•THOR s Firmware a Changes

Support: AC•THOR / AC•THOR 9s Firmware a0020410 changes

  • All signal sources, including those that were previously only selectable via the web interface, can now be set on the display.
  • The frequency mode is no longer a separate operating mode. Instead, frequency control can be selected as a signal source. Thus, the operating modes M1 to M7 can now be used in AC off-grid systems.
  • A firmware update on a unit in "M8 frequency mode" automatically switches it to "M1 hot water" operating mode and "frequency" is set as the signal source.
  • New signal source "Fronius Gen24 Manual" added.
  • Correction for operating mode M7. The PWM output signal works correctly again.
  • The heat pump operating mode M4 can now also be used if no meter value is known at the feed-in point. The power specifications, e.g. via Modbus TCP, are sufficient information for the control.
  • The combination with charging columns from KEBA and Eaton is now also possible if no meter value is known at the feed-in point. The power specifications, e.g. via Modbus TCP, are sufficient as information for the control.
  • Further information here:/(German)
  • Optimising the data connection with my-PV.LIVE
  • Here you will find the latest

More articles

reduxi Logo

Partner

Reduxi ora compatibile con my-PV

Acqua calda intelligente con surplus PV: Reduxi ora compatibile con i dispositivi my-PV.

Leggi di più...
Five white my-PV company cars in front of the building with wooden facade, logo, and solar panels.

Azienda

Auto elettriche presso my-PV

Vediamo il futuro non solo nella tecnologia degli edifici (solare-)elettrici, ma anche nel settore della mobilità.

Leggi di più...
Aerial view of my-PV building with solar panels on roof and facade, visible logo, and cars in the parking lot.

Azienda

Attivazione del nucleo in calcestruzzo nell’edificio aziendale – Rapporto annuale 2024

Come il nostro edificio aziendale solare-elettrico continua a impressionare nel terzo anno nonostante l’aumento dei costi del

Leggi di più...