AC•THOR 9s – Operation with 3 single-phase heating elements
Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.
The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.
CAUTION:
This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!
The following instructions from the operating manual are important:
Solution
The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).
Cose da sapere
Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!
More articles
Generale
Tre moduli fotovoltaici coprono il 50% dei bisogni di acqua calda.
Con solo alcuni moduli, puoi generare quantità significative di acqua calda - utilizzando SOL•THOR.
Leggi di più...Azienda
Merry Christmas and a happy New Year 2025
During Christmas, we are taking a short break. Our technical support will be available during the holidays.
Leggi di più...Referenze
Le nuove normative sull'inserimento in rete nei Paesi Bassi richiedono una riflessione
Un proprietario olandese minimizza le tariffe di alimentazione utilizzando l'energia in eccesso dei pannelli solari.
Leggi di più...