ETHERMA und myPV News
|Ondersteuning

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Wist u dat?

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

House with beige walls, red roof, and solar panels. Surrounded by greenery, clear sky above.

Referenties

Reduce gas consumption with SOL•THOR

Geen gasboiler nodig: Eengezinswoning in Baden-Württemberg tot medio november autonoom voorzien van fotovoltaïsche warmte

Lees meer...
Modern building exterior with large glass windows, surrounded by trees. The pathway is lined with white rectangular tiles.

Referenties

Groene energie voor Casa Verde

Casa Verde toont aan hoe moderne architectuur, hoog comfort en fotovoltaïsche warmteopwekking kunnen worden gecombineerd.

Lees meer...
Logo of Solar Solutions Amsterdam with icons for smart storage, EV charging, and solar energy in orange, blue, and green circles.

Bedrijf

my-PV bij Solar Solutions in Amsterdam 2026

my-PV exposeert samen met SMA op Solar Solutions Amsterdam.

Lees meer...